⚙ Company Burden Rates apply to all tabs · click to expand▼
These rates stack on top of base wage + CBA fringes before any margin is applied. Set them once — they drive the Labor Rate tab, Crew Builder, and all margin calculations.
REFERENCE ONLY · these tabs do not drive any calculations
Schedule & Role
Labor Burden Rates
These rates are set in Company Settings above the tabs and apply to all calculations.
12%
⚠ REFERENCE ONLY — Rates shown here use this margin for display purposes. The Crew Builder uses its own independent margin settings.
Avg Billing Rate / Hour
$0.00
ST · OT · DT
All Roles — Billing Rates 66
Add Equipment
Operating Costs
15%
⚠ REFERENCE ONLY — Bill rates shown here use this margin for display. The Crew Builder uses its own independent equipment margin. · Default set to 15%: equipment carries OH (10%) + GL (3%) = 13% burden, so anything below 13% nets negative — 15% is the practical floor for real net profit on iron.
TRUE COST / HR
$0.00
BILLING RATE / HR
$0.00
Equipment Library 0 items
NameTypeTrue $/hrBill $/hrDaily @10hr
No equipment yet. Add from the left or load default fleet.
Templates
No saved templates
Settings
Weekly Schedule
ST hrs/wk40
OT hrs/wk0
DT hrs/wk0
Total hrs/wk40
Bid Margins
12%
15%
⚡ OH (10%) + GL (3%) = 13% burden on equipment — margin must exceed 13% just to break even on net. 15% is the practical floor; 16–18% recommended on heavy iron.
12%
Labor Composition
RoleNameCountDaily $
Equipment on Job 0 items
EquipmentTypeQty$/hrDaily
No equipment added
Lump Sum Items
Company Burden Rates applied to all labor
Payroll Taxes9.00%
Workers Comp2.87%
Co. Overhead10.00%
GL / Umbrella3.00%
Total Burden24.87%
Edit in Company Settings ↑
Total Job Bid
$0
0 days · $0/day
Daily Breakdown
Labor $0
Equipment $0
Lump Sums $0
Per Diem (pass-through)$0
Approx Daily Rate$0
Cost Per Crew Hour$0.00
Per Diem Pass-Through$0
Lump Sum Margin Earned$0
Total Job Bid$0
Direct Cost base+fringe+eq+lump+pd$0
Burdened Cost +taxes/WC/OH/GL$0
Gross Margin before burden$0
Net Margin after all burden$0
Manpower
Headcount0 people
Daily Man-Hours0 mh
Weekly Man-Hours0 mh
Total Job Man-Hours0 mh
Project Information
Bid Components
Push items from Crew Builder
Adders
Total Bid Value
$0
—
Components Subtotal$0
Mob / De-Mob$0
Perf & Payment Bond$0
Contingency$0
Grand Total$0
Cost Breakdownall-in
Burdened Components labor+eq+lump+pd$0
Mob / De-Mob Cost$0
Bond Premium Cost$0
Total All-In Cost$0
Gross Margin before burden$0
Net Margin after all costs$0 (0.0%)
EXCEL EXPORT
📊
Your Excel file is ready. Formatted with headers, currency, and margins.
Select Equipment
GRIDFORGE
T&D ESTIMATING
Sign in to continue
Access is restricted. Contact your GridForge admin to request access.
Saved Bids
✕ NEW BID
This will clear:
· Schedule, headcount & role counts
· Equipment on job & lump sums
· All Summary line items
Equipment Library and Templates are kept.
EQUIPMENT CATALOG
Click + Add to add to your library · 0 items
True cost rates are estimates — verify against your actual costs